Home 
   Space Shuttle Mission STS-131 to the International Space Station Bookmark and Share                                This site is under re-construction

Just Click: Sponsors Pay for Food.
Buy Space Memorabilia, Flight Suits, Toys, Games
MySpace

Subscribe by email or Skype, AOL, Windows Live, Yahoo Messenger, Twitter
Subscribe to Space and Astronautics News:
Enter your Email Address:
Privacy Policy: Your address is confidential, and will not be disclosed to third parties.

Local and International Weather Forecasts


Help keep Space and Astronautics News online.


SiteUptime Web Site Monitoring Service

Labelled with ICRA

Add to My NASA

11/20/09: STS-129: Crew grapples Express Logistics Carrier 2.
Mission Control Center Status Report #09
5 p.m. CST Friday, Nov. 20, 2009 , Mission Control Center, Houston, Texas

STS-129
Mission: STS-129

Orbiter: Atlantis

Launch Pad: 39A

Launch Date: NET Nov 16, 2009, 14:28:09 EST (19:28:09 UT)

Landing: Nov 27, 2009

Main gear touchdown: 09:44:23 EST

Nose gear touchdown: 09:44:36 EST

Wheels stop: 09:45:05 EST

Orbital Altitude: 122 nautical miles (140 miles)

Orbital Insertion: 191 nautical miles (220 miles)

Orbital Inclination: 51.6 degrees

Distance traveled: ~4.5 million miles

Crew:- Commander: Charles O. Hobaugh; Pilot: Barry E. Wilmore; Mission Specialists:- MS1 Leland D Melvin, MS2 Randolph Bresnik, MS3 Michael Foreman, MS4 Robert Satcher, MS5 (landing) Nicole Stott.
Primary Payload: ExPRESS (Expedite the Processing of Experiments to the Space Station) Logistics Carriers ELC1 and ELC2:-

ExPRESS Logistics Carrier-1 manifest:- Ammonia Tank Assembly; Battery Charge Discharge Unit; Space Station Remote Manipulator System Latching End Effector; Control Moment Gyro; Nitrogen Tank Assembly; Pump Module; Plasma Contactor Unit; two empty Passive Flight Releasable Attachment Mechanisms.

ExPRESS Logistics Carrier-2 manifest:- High Pressure Gas Tank; Cargo Transport Container 1 (CTC-1) mounted to a Small Adapter Plate Assembly; Mobile Transporter/Trailing Umbilical System; Control Moment Gyro; Nitrogen Tank Assembly; Pump Module; Utility Transfer Assembly (UTA) Flight Support Equipment (FSE); one empty Payload Passive Flight Releasable Attachment Mechanism.



Preparations for the second spacewalk of Atlantis’ STS-129 visit to the International Space Station, transfer of material between the spacecraft and talks with media representatives helped keep astronauts busy on Friday.

The Atlantis crew, Commander Charles Hobaugh, Pilot Barry Wilmore and Mission Specialists Leland Melvin, Randy Bresnik, Mike Foreman, Robert Satcher Jr. and Nicole Stott, also tackled various maintenance, troubleshooting and science activities.

Station Expedition 21 crew members, Commander Frank De Winne and Flight Engineers Jeffrey Williams, Maxim Suraev, Roman Romanenko and Robert Thirsk, joined in those activities.

A little after 6 a.m., the shuttle’s robotic arm grappled Express Logistics Carrier 2 in the shuttle cargo bay. It will be handed off to the station arm Saturday and attached with its load of large spare parts to the outside of the station. Its sister carrier, ELC 1, was attached to the station on Thursday.

Foreman and Bresnik, the Saturday spacewalkers, prepared spacesuits and configured tools for their excursion. Both crews spent an hour shortly before bedtime reviewing spacewalk procedures.

Among spacewalk tasks will be installation of a second Payload Attachment System, this one on the upper part of the Starboard 3 truss. It was to have been done on the third spacewalk on Monday, but was moved to Saturday. The first PAS installation, initially scheduled for Saturday, was completed as a get-ahead task by Foreman and Satcher during the mission’s first spacewalk on Thursday. Satcher will be Saturday’s intravehicular officer.

Other spacewalk jobs Saturday include installation of a Grappling Adaptor to On-Orbit Railing (GATOR) assembly, which is part of a demonstration of two ship Automatic Identification System receivers, relocation of a Floating Potential Measurement Unit and installation of a Wireless Video System transceiver.

The movement of materials between Atlantis and the station continued to go well Friday. Well over half the mission’s transfer activities have been completed.

Crew members participated in three chats with media representatives. Hobaugh and Wilmore spoke with CBS News, Fox News Radio and Nashville’s WTVG-TV shortly after 5 a.m. Melvin and Satcher were on the Tom Joyner Morning Show at about 6:30 a.m. A little after 3:30 p.m., Hobaugh, Melvin and Satcher talked with ESPN’s SportCenter, Black Entertainment Television News and WRIC-TV in Richmond, Va.

Troubleshooting continued on Atlantis’ Orbiter Communication Adapter after difficulties with transmission of high-data-rate material. On the station, change out of circuit boards in the Human Research Facility rack was completed.

The next shuttle status report will be issued after the Saturday crew wakeup call, scheduled for 2:28 a.m.


Nov 20: Astronauts Leland Melvin (left), STS-129 mission specialist; and Jeffrey Williams, Expedition 21 flight engineer, are pictured in the Harmony node of the International Space Station while Space Shuttle Atlantis remains docked with the station. Credit: NASA

- courtesy of NASA




Space and Astronautics News is completely opposed to the use of any animals in science experiments, including in space missions.

Timezones:
EST = (UT - 5 hours)
EDT = (UT - 4 hours) = (CDT + 1 hour)
CST = (UT - 6 hours)
CDT = (EDT - 1 hour) = (UT - 5 hours)
PST = (UT - 8 hours)
PDT = (UT - 7 hours)
MDT = (UT - 6 hours)
UT [GMT] = (EDT + 4 hours)
BST = (EDT + 5 hours) or (CDT + 6 hours) = (UT + 1 hour)
CEST = (UT + 2 hours) = (BST + 1 hour)

EDT, CDT, PDT, MDT daylight saving time = EST, CST, PST, MST +1hr. From 2007, this begins on the second Sunday in March, and ends on the first Sunday in November.

[Until 2007, EDT, CDT, PDT, MDT used to start at 02:00 local time on the first Sunday in April. EST, CST, PST started at 02:00 local time on the last Sunday in October.]

UT is also known as GMT (Greenwich Mean Time), Z, and UTC (Coordinated Universal Time). It is the time set on the International Space Station.

*Where '/' appears in dates, this site follows the following format: mm/dd/yr

Copyright © Space and Astronautics News 1999 - 2010 All Rights Reserved.